Difference between revisions of "Steel mill"

From IdleCorp Wiki
Jump to navigation Jump to search
m (fix typo in production/min and fix wording on description)
m (fix table)
Line 1: Line 1:
 
{|class="wikitable" style="float:right;"
 
{|class="wikitable" style="float:right;"
 +
|-
 +
!colspan="2"| Cost
 +
|-
 
|'''Cost''' || $150, 250x [[coal]], 500x [[iron]]
 
|'''Cost''' || $150, 250x [[coal]], 500x [[iron]]
 
|-
 
|-
 
|'''Total Cost''' || $1200
 
|'''Total Cost''' || $1200
 +
|-
 +
!colspan="2"| Production
 
|-
 
|-
 
|'''Inputs''' || 4x [[coal]], 1x [[iron]]
 
|'''Inputs''' || 4x [[coal]], 1x [[iron]]
Line 11: Line 16:
 
|-
 
|-
 
|'''Production/Min''' || 1.714x [[steel]]
 
|'''Production/Min''' || 1.714x [[steel]]
 +
|-
 +
!colspan="2"| Profit
 
|-
 
|-
 
|'''Profit/Min''' || $8.92
 
|'''Profit/Min''' || $8.92
Line 18: Line 25:
 
|'''Return On Investment''' || 0.744%
 
|'''Return On Investment''' || 0.744%
 
|-
 
|-
|'''Aliases'''||steel mill, steelmill,<br/> steel furnace, steelfurnace
+
!colspan="2"| Aliases
 +
|-
 +
|colspan="2"|steel mill, steelmill, steel furnace, steelfurnace
 
|}
 
|}
 
[[Category:Facility]]
 
[[Category:Facility]]

Revision as of 23:44, 6 May 2021

Cost
Cost $150, 250x coal, 500x iron
Total Cost $1200
Production
Inputs 4x coal, 1x iron
Outputs 1x steel
Production interval 35 seconds
Production/Min 1.714x steel
Profit
Profit/Min $8.92
Profit/Hour $535.32
Return On Investment 0.744%
Aliases
steel mill, steelmill, steel furnace, steelfurnace

The steel mill is a facility that produces 1x steel every 35 seconds. steel used mainly for Construction Material rather than production input. the List of Building that use steel can be seen below.

You need 1/7th of a Coal mine and 2/3 of an Iron mine to maintain this factory.

You need 3 Coal mine and 14 Iron mine and 21 Steel mill to create fully passive production line without excessive input.

Related facilities

As construction material

As input